2026-08-25
A Service Level Agreement (SLA) is the part of an O&M contract that turns "good service" from vague promise into binding numbers: within how many hours must a fire-system fault get a response? Within how many days must a routine AC fault be closed? What is the penalty for missing it? For the owner, the SLA is a quality guarantee. For the O&M company, it cuts both ways: a trust-builder that wins contracts — and a source of penalties when it isn't measured and managed properly.
Because measurement is manual. The request arrives on WhatsApp with no recorded time, the technician closes it verbally, and at month-end a team reconstructs history from memory and chat scroll. The owner calculates it their way, the company has no defensible record, and the penalty is deducted. The equation flips when the SLA clock starts automatically the moment a request is logged, warns the supervisor before a breach, and records every timestamp — reporting turns from argument into a shared record.
In MRFQ every contract carries its priorities and clocks; the system starts timers automatically, alerts before breaches, and produces compliance reports per client and site — while technicians close their jobs with photos over WhatsApp, in their own language, no training needed. Arabic-first and PDPL-aligned. Try it free for 14 days at mrfq.sa.
The part of a service contract defining binding response and resolution times per priority class, target compliance rates, and penalties for misses.
Response time runs from request opened to work started or technician on site; resolution time runs from opened to fully documented closure.
Automatic measurement from the moment a request opens, alerts before deadlines, and photo-and-timestamp closure documentation — which is what MRFQ does automatically.
Yes — best practice passes the same (or slightly stricter) clocks into subcontracts and tracks them in the same system, so the main contractor doesn't absorb its subcontractors' penalties.
Serious contracts typically target 90–98% depending on priority — highest for emergencies — and what matters is measuring from a documented record, not memory.