A maintenance schedule is built from assets, not from a calendar. Start by listing the building's critical assets, then derive each asset's interval from three sources: the manufacturer's recommendation, what the maintenance contract specifies, and the asset's own failure history.
The order matters. A schedule that starts from generic dates copied from another building fails, because every building differs in its assets, their loads, and their age.
A critical asset is one whose failure halts the building or affects resident safety. In most residential buildings the list starts with:
Record each asset's location and the date of the last work performed on it. In MRFQ's asset management, every asset carries its own record, turning "when was the pump last serviced?" from an act of memory into something you open in seconds.
Do not invent dates. Every asset has a source that sets its interval, and your job is to gather those sources rather than improvise over them:
A schedule written in a file does not execute itself. The practical problem in owners associations is that board members change, and the dates leave with whoever remembered them.
Preventive maintenance in MRFQ addresses this: scheduled work on assets raises work orders automatically on their due dates and reaches the assigned party without depending on anyone's memory.
Work that was done but not documented does not exist at the first dispute with owners, or at contract renewal. The minimum for each maintenance visit:
The schedule is a living document. Each operating year changes asset ages and accumulates failure data, shortening one interval and lengthening another. The annual review before budget preparation is the natural moment for it.
Read next:
To see preventive maintenance raising work orders on their due dates, book a demo with the MRFQ team.
From the manufacturer's recommendation or asset data plate, from the visit scope specified in the maintenance contract, from the requirements of competent authorities for safety systems and lifts, and then from the asset's own failure record.
Preventive work is scheduled and performed before a failure to prevent it; reactive work responds after one. Relying on reactive work alone costs the association twice: in the emergency repair and in resident trust.
Start with critical assets only: lifts, pumps, HVAC and safety systems. These cover most daily activity, and the record can expand gradually once they are stable.
The executive regulation states that the manager's powers include providing the materials, services and works needed for the shared property and its maintenance, and supervising execution, staff and contracted vendors.